Operational efficiency: ticketing, approvals and SLA follow-up
Every property has a queue of things to fix. This capability turns calls, emails and hallway requests into tracked tickets with an owner, a deadline and a visible history.
Who uses it
Facility managers dispatch and monitor; technicians and contractors work tickets from mobile; requesters follow progress.
A representative flow, end to end
A tenant reports a broken door closer with a photo. The ticket is categorised, assigned to the in-house technician with a 48-hour target and the tenant sees each status change.
Repairs above a cost threshold go through an approval step before work starts, and the approval is stored on the ticket.
When something goes wrong
If a ticket breaches its SLA, it is flagged for the manager and can be escalated or reassigned, so nothing silently ages in an inbox.
What to test in a demo
- Raise a ticket as a tenant and follow it as a technician
- Trigger an approval for a costly repair
- Look at overdue tickets by category and by contractor
Limits and implementation notes
SLA targets and categories are yours to define; the platform measures against them but does not set contractual SLAs for you.
FAQ
How does facility ticketing work?
Requests become tickets with a category, owner and deadline; status changes are visible to the requester until closure.
Can external contractors use it?
Yes. Contractors see only the tickets assigned to them and update them from mobile.
How are SLAs tracked?
Each category has a target; tickets close to or past the target are flagged for the manager.
Request a walkthrough
We will run this flow on a property like yours and answer the test questions above.
Request a walkthrough